Lay the krono original laminate floor at right angles to the run of the wooden floorboards.
Krono original laminate flooring installation.
And that means more than consistently delivering high quality flooring.
Lay the first panel with the tongue side short side parallel to the wall and secure the expansion gap with wall spacers.
This video offers best practice tips on how to install laminate flooring by the makers of laminate flooring swiss krono for the clic2clic method.
They believe their customers shouldn t have to jump through hoops to get what they want.
Prior to installing the laminate flooring on a mineral based sub surface concrete screed etc it is crucial that a suitable vapour barrier sheet pe foil is put down with 1 2 centime tre 0 40 0 80 90 edging at the sides like a shallow tub as a protection against moisture.
Before installing your laminate floor you should make sure that the subfloor does not spring or bounce and cannot easily be pushed in when a load is applied.
Begin installing in the left hand corner of the room.
Carpeting is generally not a suitable subfloor for laying laminate and must be removed before you install your krono original laminate.
You need to attach loose floorboards and level any uneven areas you need to create a solid and level substrate.
With wooden floorboards you must not use a pe film.